image kayak
 

Composite kayak factory

Fabrics installation (fibres)


1. Fabrics installation (fibres)

Vacuum bagging molding with Vinylester resin
  2. Vacuum bagging molding with Vinylester resin
Cutting and drilling

Trimming

4. Trimming

3. Cutting and drilling  

Hull and deck assembling

5. Hull and deck assembling

Deck rigging and outfitting
  6. Deck rigging and outfitting

 

 

 
BorealDesign - LogoIcone Téléphone(418) 878-3099 Icone télécopieur(418) 878-3459
Icone courriel info@borealdesign.com
  • 170 Rotterdam
  • Industrial Park
  • Saint-Augustin-de-Desmaures (Québec)
  • Canada, G3A 1T3
  • Icone télécopieur info@borealdesign.com
  • Icone Téléphone (418) 878-3099
  • Icone télécopieur (418) 878-3459